First United Methodist Church – Hurst, Texas

Hahnfeld Hoffer Stanford was initially retained to provide an updated master plan for the church’s facilities. After analyzing recent trends in membership and attendance, a master plan was presented to the Long Range Planning Committee.

The following was designed and constructed based on the building committee’s desires: 14 new classrooms, Family Life Center with kitchen, stage, and a flexible meeting space, Refurbishment and reconfiguration of existing classroom space in the children’s wing, the Isham Education Building, and elevator and ramp additions, make the entire facility accessible.